Gas Processing

Chacher Gas Processing Facility for Tullow — Pakistan

Chacher gas field, Pakistan

No items found.

Overview

Project Overview

Design, detailed engineering, fabrication and commissioning of a 30 million cubic feet a day sour gas processing facility with 7,500 barrels a day of condensate stabilisation for Tullow Pakistan.

Client

Tullow Pakistan Ltd

Location

Chacher gas field, Pakistan

Country

Pakistan

Capacity

30 million cubic feet a day

Project type

Gas Processing

Completion

2007

Delivery

Scope of Supply

SPEC's scope included the design, detailed engineering, fabrication and commissioning of the gas processing facility for Tullow Pakistan at the Chacher gas field: 30 MMSCFD of sour gas with 7,500 BPD of condensate.

Scope of supply: skid-mounted three-phase production separator and test separator, 30 MMSCFD amine sweetening facility, 30 MMSCFD TEG dehydration facility, heat medium package, incinerator unit, DCS, chemical injection skids, sour water system, instrument air system, HP and LP flare systems, metering skid, water bath oil heater, crude oil stabilisation column with internals and two crude oil transfer pump skids.

Related work

More Projects

Other delivered systems from the SPEC project library.

Similar requirement?

Discuss Your Process Requirement

Send the duty, the composition and the constraints. Our engineers will come back with a technical route and an indicative scope of supply.

Contact our team

Welders working on a pressure vessel at SPEC's Jebel Ali fabrication facility
Rolled shell course in SPEC's Jebel Ali fabrication hall
Equipment
01
Solutions
02
Projects
03

About Us

05

Contact