Overview

Project Overview

Engineering and supply of the full process train for a 60 million cubic feet a day sour gas plant: two amine sweetening trains, two glycol dehydration trains, dew point control, LPG recovery and condensate stabilisation.

Client

Dewan Petroleum (Pvt) Ltd

Location

Salsabil Gas Field, Pakistan

Country

Pakistan

Capacity

60 million cubic feet a day

Project type

Gas Processing

Completion

2008

Delivery

Scope of Supply

SPEC engineered and supplied the full process train for the Salsabil gas field, handling 60 MMSCFD of sour gas with 12,000 barrels a day of condensate.

The process train comprised wellhead control panels and chemical injection skids, production manifolds, production and test separators, two 30 MMSCFD amine gas sweetening trains, two 30 MMSCFD triethylene glycol dehydration trains, hydrocarbon dew point control, LPG recovery and a condensate stabilisation column with internals.

Supporting systems included high and low pressure flare, fuel gas conditioning, water bath oil heaters, four 10,000 barrel API 650 storage tanks, instrument air and SCADA.

Related work

More Projects

Other delivered systems from the SPEC project library.

Similar requirement?

Discuss Your Process Requirement

Send the duty, the composition and the constraints. Our engineers will come back with a technical route and an indicative scope of supply.

Contact our team

Welders working on a pressure vessel at SPEC's Jebel Ali fabrication facility
Rolled shell course in SPEC's Jebel Ali fabrication hall
Equipment
01
Solutions
02
Projects
03

About Us

05

Contact